Our Projects — Construction Project Management & Cost Consultancy Projects that speak for themselves.
From complex residential schemes and logistics parks to infrastructure delivery and commercial fit-outs — a selection of the work we’re proud to have been part of.

Selected projects
A selection of schemes across the Midlands and the UK where our team has provided project management, cost management and commercial advice — from early feasibility through to handover. Filter by sector to see experience relevant to your project.
Winterfold House School Hockey Pitch & MUGA
c. £1.2m full-size sand dressed hockey pitch and two floodlit tennis and netball courts, delivered on a live school site within a 14-week programme and to budget. Read the case study →
Newbold Comyn & St Nicholas Park Leisure Centres
£12.65m refurbishment and extension of two existing public leisure centres, coordinated around live M&E and kept open throughout, with a 10% value engineering saving at design stage. Read the case study →
Sidney Stringer Primary School
c. £3.5m new two-form entry primary school for Sidney Stringer Multi Academy Trust, procured through the EFA regional framework. Read the case study →
Specialist Autism School, Norwich
£6.5m purpose-built specialist school for up to 100 autistic pupils aged 4 to 19, delivered on a JCT Design and Build contract. Read the case study →
Independent School Dining Hall, Bromsgrove
c. £3m refurbishment and extension of an independent school dining hall serving 1,400 pupils a day, taken from inception to RIBA Stage 3. Read the case study →
Perry Barr Residential Scheme, Plots 8 & 9
£78m scheme of 430 new homes, part of the Perry Barr regeneration accelerated by the 2022 Commonwealth Games, delivered under NEC with offsite construction. Read the case study →
Hartlebury Trading Estate
c. £4m design and build refurbishment and extension creating up to five flexible units for an institutional property fund. Delivered on programme and within budget, and fully let. Read the case study →
Unit 30, Hartlebury Trading Estate
New-build 30,000 sq ft warehouse and office facility for Etac on a 15-year pre-let, for an institutional property fund. Read the case study →
Greenlight Heathrow
41,955 sq ft logistics unit next to Heathrow Airport, targeting BREEAM Outstanding and EPC A+, from inception to contractor appointment. Read the case study →
Greenlight Reading
49,208 sq ft logistics unit on a brownfield site in Reading, targeting BREEAM Outstanding and EPC A+, from inception to contractor appointment. Read the case study →
EV Battery Test Facility, Gaydon
£20.3m electric vehicle battery test facility for a global automotive manufacturer, engineered for destructive testing of live batteries on an occupied site. Read the case study →
Fujifilm UK HQ, Bedford
c. £7.5m, 30,000 sq ft design and build UK headquarters combining a showroom, workshop and offices, led from first brief to handover. BREEAM Very Good, EPC A. Read the case study →
Research & Development Facility
Specialist research and development facility requiring precise technical coordination across mechanical, electrical and fit-out packages. October Projects managed the programme from design stage through to operational handover.
A38 Major Road Network
NEC Project Manager and Commercial Advisor to North Somerset Council on five DfT-funded A38 improvements, a two-stage contract with Octavius moving from NEC PSC to ECC Option C. Read the case study →
Private Residential Refurbishment
Substantial refurbishment and extension of a private residential property, including structural alterations and high-specification finishes. Full cost management and building surveying services provided from inception to completion.
Planning a home project? See our residential service →West Midlands Care Village
Purpose-built care village providing specialist residential care facilities. October Projects delivered development management services from site acquisition through planning, procurement and construction to CQC registration.
Greenlight Redditch
c. £20m, 193,000 sq ft redevelopment of a former factory into five units, targeting BREEAM Outstanding and EPC A*, from inception to contractor appointment. Read the case study →
Greenlight Milton Keynes
c. £20m, 176,000 sq ft scheme of three units, including a pre-let, targeting BREEAM Outstanding and EPC A*, from inception to contractor appointment. Read the case study →
Explore further
Find out how we can help on your project
Start a Conversation
Have a project
in mind?
We’d love to hear about your scheme. Get in touch to discuss how October Projects can help.
