Case Study — Sport & Leisure New Diving Centre, Barnet Copthall

Lead Cost Manager and Employer’s Agent through the pre-contract stages of a £12m new diving centre for North London Aquatics at Barnet Copthall, procured through a two-stage design and build tender under NEC3 Option A.

The challenge

A dedicated home for diving in North London

Diving tower with fixed platforms above an indoor pool

North London Aquatics proposed a new purpose-built diving facility at Barnet Copthall, giving divers a dedicated home alongside the wider leisure offer on the site. The scheme included a 25m pool, fixed diving boards, spectator seating, a judges’ area and changing facilities, together with associated external and utility works.

Specialist aquatic buildings bring their own cost challenges: deep pool tanks, diving structures, pool plant and environmental control, and the requirements of competition diving. Robust cost planning through the pre-contract stages was essential to give the client confidence in the budget before committing to construction.

Delivered by Ollie Thompson MRICS in a previous role at Mace.

Project facts

At a glance

Lead cost management and Employer’s Agent services through the pre-contract stages, preparing the scheme for a two-stage design and build tender under NEC3 ECC Option A with client amendments.

Client

North London Aquatics

Location

Barnet Copthall, North London

Value

£12m

Our role

Lead Cost Manager and Employer’s Agent (pre-contract)

Facilities

25m pool, fixed diving boards, spectator seating and judges’ area

Scope

New build diving centre, changing facilities, external and utility works

Procurement

Two-stage design and build tender

Contract

NEC3 ECC Option A, with client amendments

Programme

12-month construction programme

Our approach

Pre-contract cost and commercial control

Pre-contract

Feasibility & Budget

Early cost advice to test the brief and set a realistic budget for a specialist diving facility.

FeasibilityBudgetRisk
Pre-contract

Cost Planning

Cost plans tracked the design as it developed, including the pool tank, diving structures, pool plant and spectator areas.

Cost planSpecialistValue
Pre-contract

Procurement Strategy

Advice on a two-stage design and build route to bring in contractor expertise early on a specialist building.

ProcurementRisk transferProgramme
Tender

Two-Stage Tender

Managing the first-stage tender and the development of the second-stage price, tested package by package.

Stage 1Stage 2Pricing
Pre-contract

Contract Preparation

Preparing the NEC3 ECC Option A contract with client amendments, including the activity schedule and Works Information.

ContractAmendmentsDocuments
Post-contract

Employer’s Agent

Reviewing the contractor’s proposals against the Employer’s Requirements and advising the client ahead of contract award.

AdministrationValuationsChange

The outcome

A purpose-built centre for competition diving

£12m

Specialist facility

A new build diving centre with pool, diving boards, spectator seating and judges’ area.

25m

Diving pool

A 25m pool designed around fixed diving boards and competition use.

2

Stage tender

Early contractor involvement through a two-stage design and build tender under NEC3 Option A.

See also our Stone Leisure Centre case study, or read NEC Option A vs Option C.