Case Study — Industrial & Logistics Greenlight Redditch

Project Manager, Employer’s Agent and Quantity Surveyor for a c. £20m, 193,000 sq ft industrial and logistics scheme at Moons Moat, Redditch, targeting BREEAM Outstanding, from inception through to appointing the main contractor.

The challenge

Turning a former factory into a net zero ready estate

Warehouse interior with rooflights at Greenlight Redditch

A logistics joint venture set out to redevelop a former manufacturing complex at Moons Moat in Redditch into a modern industrial and logistics estate: four new speculative units of 10,000 to 67,475 sq ft, with Category A offices, alongside the refurbishment and extension of an existing building for an occupier staying on site.

The sustainability targets were among the most demanding in the sector: BREEAM Outstanding, EPC A* and Net Zero Carbon in Operation Ready, with solar PV, air source heat pumps, rainwater harvesting and EV charging. All of this had to be set up and priced correctly before a contractor was appointed.

Delivered by Ollie Thompson MRICS in a previous role at Trinity Property Consultants.

Project facts

At a glance

Appointed from RIBA Stage 0 through to procuring the main contractor, on a JCT Design and Build contract with client amendments.

Client

Logistics joint venture

Location

Moons Moat, Redditch, Worcestershire

Value

c. £20m

Contract

JCT Design and Build with client amendments

Our role

Project Manager, Employer’s Agent and Quantity Surveyor

RIBA stages

0–4, from inception to contractor appointment

Scheme

193,000 sq ft: four new units and one refurbished and extended unit

Sustainability

BREEAM Outstanding, EPC A*, Net Zero Carbon in Operation Ready

Main contractor

Benniman

Our approach

From inception to contractor appointment

RIBA 0

Strategic Definition

Setting the brief, budget and programme for redeveloping a live manufacturing site, including the units to be demolished, retained and extended.

BriefBudgetFeasibility
RIBA 1

Preparation & Team

Assembling the professional team and setting up project governance, reporting and cost control.

AppointmentsGovernanceCost Plan
RIBA 2

Concept Design

Testing the design against the cost plan and the BREEAM Outstanding, EPC A* and net zero targets.

DesignSustainabilityValue
RIBA 3

Spatial Coordination

Coordinating the design and keeping the budget aligned as the scheme moved through planning.

PlanningCoordinationCost Control
RIBA 3–4

Employer’s Requirements

Preparing the Employer’s Requirements and the client’s amendments to the JCT Design and Build contract.

ERsAmendmentsRisk
RIBA 4

Main Contractor Procurement

Running the tender, analysing the returns and appointing Benniman as main contractor.

TenderAnalysisAppointment

The outcome

A sustainable estate, ready to build

£20m

Industrial scheme

193,000 sq ft of new and refurbished space.

5

Units

Four new-build units and one refurbished and extended unit.

A*

EPC rating

With BREEAM Outstanding and Net Zero Carbon in Operation Ready.

Images: Trinity Property Consultants. See our Project & Programme Management and Employer’s Agent services, or view all projects.