Case Study — Industrial & Logistics Greenlight Reading

Project Manager, Employer’s Agent and Quantity Surveyor for a 49,208 sq ft industrial and logistics unit on a brownfield site in Reading, targeting BREEAM Outstanding, from inception through to appointing the main contractor.

The challenge

A brownfield site brought back into use

Design drawings for a new industrial scheme

A logistics joint venture set out to replace redundant buildings on Bennet Road, Reading, with a single new industrial and logistics unit of 49,208 sq ft, 1.5 miles from M4 Junction 11. The scheme comprises 41,512 sq ft of warehouse and 7,696 sq ft of Cat A offices, with a 35m secure yard and 39 parking spaces.

The specification targeted BREEAM Outstanding, EPC A+ and Net Zero Carbon Operations Enabled, with solar PV, EV charging, 12m eaves, 50 kN/m² floor loading, 500 kVA of power and a wellness garden. The works had to be packaged in two phases, demolition and site clearance followed by construction, and defined, priced and secured in the contract before a contractor was appointed.

Delivered by Ollie Thompson MRICS in a previous role at Trinity Property Consultants.

Project facts

At a glance

Appointed from RIBA Stage 0 through to procuring the main contractor, on a JCT Design and Build contract with client amendments.

Client

Logistics joint venture

Location

Bennet Road, Reading

Specification

12m eaves, 500 kVA, 35m secure yard

Contract

JCT Design and Build with client amendments

Our role

Project Manager, Employer’s Agent and Quantity Surveyor

RIBA stages

0–4, from inception to contractor appointment

Scheme

49,208 sq ft unit: 41,512 sq ft warehouse and 7,696 sq ft offices

Sustainability

Targeting BREEAM Outstanding, EPC A+ and Net Zero Carbon Operations Enabled

Main contractor

Benniman

Our approach

From inception to contractor appointment

RIBA 0

Strategic Definition

Setting the brief, budget and programme for a single new unit on a brownfield site with redundant buildings to clear.

BriefBudgetFeasibility
RIBA 1

Preparation & Team

Assembling the professional team and setting up project governance, reporting and cost control.

AppointmentsGovernanceCost Plan
RIBA 2

Concept Design

Testing the design against the cost plan and the BREEAM Outstanding, EPC A+ and net zero targets.

DesignSustainabilityValue
RIBA 3

Spatial Coordination

Coordinating the design and keeping the budget aligned as the scheme moved through planning.

PlanningCoordinationCost Control
RIBA 3–4

Employer’s Requirements

Preparing the Employer’s Requirements, phasing the demolition and new build works, and drafting the client’s amendments to the JCT Design and Build contract.

ERsAmendmentsRisk
RIBA 4

Main Contractor Procurement

Running the tender, analysing the returns and appointing Benniman as main contractor.

TenderAnalysisAppointment

The outcome

A net zero ready unit, ready to build

49,208

Sq ft

A new logistics unit with 7,696 sq ft of Cat A offices and a 35m secure yard.

A+

EPC target

Alongside BREEAM Outstanding and Net Zero Carbon Operations Enabled.

1.5

Miles to the M4

Junction 11 is close by, with the A33 a minute away.

Images: Benniman. See also our Greenlight Heathrow, Greenlight Redditch and Greenlight Milton Keynes case studies, or our Project & Programme Management and Employer’s Agent services.