Specialist teaching space at a purpose-built autism school in Norwich

All Projects

Case Study — Education Specialist Autism School, Norwich

Quantity Surveyor for a £6.5m purpose-built specialist school for up to 100 autistic pupils aged 4 to 19 in Norwich, from RIBA Stage 0 to handover.

The challenge

A school designed around its pupils

Specialist classroom at a purpose-built autism school in Norwich

An academy trust needed a new, purpose-built school on an urban site in Norwich for up to 100 pupils aged 4 to 19 with a diagnosis of autism, each with an Education, Health and Care Plan.

Every detail had to support the pupils’ learning: a linear layout arranged by age group to ease transitions between key stages, specialist teaching areas, carefully chosen lighting and colours, and tight control of noise from plant and from outside, to meet the acoustic standards for pupils with special hearing and communication needs.

Delivered by Ollie Thompson MRICS in a previous role at Mace.

Project facts

At a glance

A purpose-built specialist school on a JCT Design and Build contract with amendments, from RIBA Stage 0 to handover.

Client

Academy trust

Location

Norwich, Norfolk

Value

£6.5m

Our role

Quantity Surveyor

School

Specialist school for up to 100 autistic pupils aged 4–19

Design

Linear layout by age group, specialist teaching areas and calm, flexible spaces

RIBA stages

0–6, from inception to handover

Contractor

Kier

Contract

JCT Design and Build with amendments

Our approach

Cost management for a specialist school

RIBA 0–2

Cost Planning

Involved from the outset, with cost plans reflecting the specialist requirements of an autism school, from acoustic performance to lighting and finishes.

Cost PlanSpecificationRisk
RIBA 2–3

Value for Money

Design choices were tested for cost so the budget went where it mattered most to pupils.

ValueOptionsBudget
RIBA 4

Procurement

Commercial input to the tender, the contractor’s appointment and the amendments to the JCT Design and Build contract.

TenderAnalysisAppointment
RIBA 5

Valuations

Monthly valuations and cost reports gave the client a clear view of the forecast final cost.

ValuationsReportingCash Flow
RIBA 5

Change Control

Changes were assessed for cost before being instructed, protecting the budget.

ChangeRiskCost
RIBA 6

Final Account

The school was handed over and the final account agreed.

CompletionHandoverFinal Account

The outcome

A purpose-built school for autistic pupils

£6.5m

Specialist school

A new purpose-built school for an academy trust in Norwich.

100

Pupils

Places for autistic pupils aged 4 to 19.

4–19

Age range

A linear layout that helps pupils move between key stages.

Images: Sotham Engineering. See our Cost & Commercial Management service, or view all projects.

Start a Project

Tell us
about your scheme.

We’ll bring the programme, the governance and the certainty. Get in touch to discuss your project.