Refurbished industrial units at Hartlebury Trading Estate, Worcestershire

All Projects

Case Study — Industrial & Logistics Hartlebury Trading Estate

Quantity Surveyor and Employer’s Agent for the c. £4m design and build refurbishment and extension of Unit 117, an existing industrial unit near Kidderminster, creating up to five flexible units for an institutional property fund.

The challenge

Repositioning an industrial asset for today’s occupiers

Aerial view of the refurbished units and service yard at Hartlebury Trading Estate

The client, an institutional property fund, owned a single large industrial unit on a secure business park off the A449, close to the M5. To widen its appeal to occupiers, the building needed to be refurbished, extended and reconfigured into up to five units of 4,579 to 27,495 sq ft, able to be combined.

That meant elevational changes, new access, parking and servicing arrangements, and fitted offices, all delivered to an institutional investor’s standards and within a c. £4m budget.

Delivered by Ollie Thompson MRICS in a previous role at Trinity Property Consultants.

Project facts

At a glance

Appointed from RIBA Stage 0 through to handover, on a design and build contract with client amendments.

Client

Institutional property fund

Location

Hartlebury, near Kidderminster, Worcestershire

Value

c. £4m

Contract

JCT Design and Build with client amendments

Our role

Quantity Surveyor and Employer’s Agent

RIBA stages

0–6, from inception to handover

Size

Unit 117, reconfigured into up to five units of 4,579–27,495 sq ft

Delivery

On programme and within budget

Project team

Hinton Design & Build (contractor), Stephen George and Partners (architect), BWB Consulting (structural engineer)

Our approach

From first brief to handover

RIBA 0–1

Brief & Cost Advice

Appointed at the very start, Ollie gave cost advice that shaped the brief and the scope of the refurbishment before design was fixed.

BriefBudgetFeasibility
RIBA 2–3

Employer’s Requirements

He prepared the Employer’s Requirements so the contractor priced and designed exactly what the client needed.

ERsCost PlanDesign
RIBA 4

Tender & Contract

He ran the tender, analysed the returns and agreed the client’s amendments to the JCT Design and Build contract.

TenderAmendmentsAppointment
RIBA 5

Construction

He administered the contract with Hinton Design & Build, with monthly valuations and cost reports giving a clear forecast of the final cost.

ValuationsCost ReportsAdministration
RIBA 5

Change Control

Changes, common when altering an existing building, were assessed for cost and time before being instructed.

ChangeRiskProgramme
RIBA 6

Handover

The units were completed on programme and within budget.

CompletionHandoverFinal Account

The outcome

Delivered on programme, within budget and fully let

£4m

Design and build refurbishment

A c. £4m scheme delivered to an institutional investor’s standards.

5

Flexible units created

Units of 4,579 to 27,495 sq ft, able to be combined to suit occupiers.

100%

Units let

Every unit has been let since completion.

Images: Hinton Group. See our Employer’s Agent and Cost & Commercial Management services, or view all projects.