Case Study — Private ResidentialPrivate Residence, Worcestershire

Quantity surveying and project management for a private client, from demolition of the existing house through to a new replacement home with a basement games and cinema room, a three-bay garage and full hard and soft landscaping.

The challenge

Replacing an existing family home with a new house built for the next generation

Principal elevation of a new replacement house in Worcestershire with bay windows and portico

A private client in Worcestershire appointed Oliver Thompson of October Projects to provide quantity surveying and project management services for the demolition of their existing house and the construction of a new replacement home on the same site.

The new house is designed in a classic Georgian style, with sash windows, bay windows, a pedimented entrance and stone detailing. Below ground, a new basement provides a games room and a cinema room. The scheme also included a detached three-bay garage and extensive hard and soft landscaping across the gardens and driveway.

Acting for the client throughout, we controlled cost from the first budget to the final account and managed the programme, the design team and the contractor, so the client had a single point of contact for the whole project.

Project facts

At a glance

Client: Private client
Location: Worcestershire
Project: Demolition and replacement dwelling
Role: Quantity Surveyor and Project Manager
Scope: New house with basement, three-bay garage and hard and soft landscaping

Budget and cost planning

Setting a realistic budget for the demolition and rebuild, and cost planning as the design developed.

Demolition and site clearance

Planning and managing the safe demolition of the existing house and preparing the site for the new build.

Basement construction

Managing the cost and risk of the new basement, which houses the games and cinema rooms.

New replacement house

Overseeing construction of the new Georgian-style house, from structure through to internal fit-out.

Three-bay garage

Delivering the detached three-bay garage alongside the main house.

Hard and soft landscaping

Managing the driveway, terraces, steps, planting and lawns to complete the setting of the house.

Tender and appointment

Preparing tender documents, analysing returns and advising on contractor appointment.

Valuations and cost reports

Valuing work on site, certifying payments and keeping the client informed of the forecast final cost.

Programme and quality

Monitoring progress and quality on site and coordinating the design team and contractor.

Our approach

How the project was delivered

Pre-contract

Feasibility and budget

Establishing a realistic budget for demolishing the existing house and building a larger replacement home with a basement.

BudgetCost planRisk
Pre-contract

Design development

Working with the design team to keep cost under control as the design developed, from the basement structure to the external detailing.

DesignValueCost checks
Procurement

Tender and appointment

Preparing tender documents, analysing returns and advising the client on the appointment of the contractor.

TenderAnalysisAppointment
Construction

Demolition and basement

Overseeing demolition of the original house and the basement excavation and structure — the highest-risk stage of the build.

DemolitionBasementRisk
Construction

House and garage

Monitoring progress, quality and cost through the construction of the main house and garage, with regular valuations and reporting.

ValuationsQualityReporting
Completion

Landscaping and handover

Completing the hard and soft landscaping, snagging and handover, and agreeing the final account.

LandscapingSnaggingFinal account

The outcome

What this meant for the client

01

One point of contact

Combining quantity surveying and project management meant the client dealt with one consultant for cost, programme and quality, rather than coordinating several advisers.

02

Cost control on a complex build

Basements carry significant risk. Early cost planning and close monitoring on site kept the budget under control from demolition through to completion.

03

A finished home, inside and out

Managing the house, garage and landscaping as one project meant the client moved into a completed home, with the gardens and driveway finished at the same time.