Case Study — Fire Remediation Confidential – Cardiff: Multi-Block External Facade Remediation

Quantity Surveyor, Employer’s Agent and Project Manager for external facade fire remediation works across a multi-block residential development in Cardiff, during the construction stage of a JCT Design and Build contract.

The challenge

Fire-safe facades across a multi-block estate

Residential apartment blocks on a confidential scheme in Cardiff

This confidential scheme is a waterfront residential development in Cardiff made up of several apartment blocks. As part of the wider programme of building safety remediation, the external facades needed upgrading so that the buildings meet current fire safety standards.

The works were delivered from scaffolding across multiple elevations of a busy waterfront site, with residents living alongside the works. That called for careful planning of access, logistics and environmental controls, together with tight control of cost, programme and quality.

Delivered by Ollie Thompson MRICS in a previous role at Rider Levett Bucknall.

Project facts

At a glance

Quantity surveying, Employer’s Agent and project management services during the construction stage of external facade fire remediation under a JCT Design and Build contract.

Stage

Construction stage (RIBA Stage 5)

Location

Cardiff, Cardiff

Sector

Fire remediation, residential

Contract

JCT Design and Build

Our role

Quantity Surveyor, Employer’s Agent and Project Manager

Scope

External facade upgrades to achieve fire compliance

Buildings

Multi-block waterfront apartment development

Facade contractor

Topek Southern

Fire engineering

PRP

Our approach

Cost, contract and delivery control on site

Construction

Mobilisation

Reviewing the contractor’s programme, logistics and construction phase plan at the start of works, with resident safety and access agreed before work began.

ProgrammeLogisticsResidents
Construction

Contractor’s Proposals

Checking the contractor’s design submissions and technical queries against the Employer’s Requirements and the fire strategy.

Design reviewERsFire strategy
Construction

Employer’s Agent

Administering the JCT Design and Build contract for the client: issuing instructions, managing notices and protecting the client’s position.

JCT D&BInstructionsNotices
Construction

Valuations & Payment

Regular valuations and payment notices, so the contractor was paid fairly for work completed in line with the contract.

ValuationsPaymentCash flow
Construction

Change & Cost Control

Assessing variations and hidden conditions uncovered once the facade was opened up, with regular cost reports to the client.

ChangeCost reportsFinal account
Construction

Project Management

Coordinating the contractor, fire engineer and building control, with resident safety and communication at the centre of a live site.

CoordinationFire engineerResidents

The outcome

Safer homes in Cardiff

3

Roles, one team

Quantity surveying, Employer’s Agent and project management combined, giving the client a single, joined-up point of contact.

D&B

Design and build

Design responsibility for the new facade sat with a specialist contractor under a JCT Design and Build contract.

Safe

Fire compliant facades

External walls upgraded so the buildings meet current fire safety standards.

Read our guide, What does an Employer’s Agent do?, or see our Employer’s Agent and Cost & Commercial Management services.

Start a Project

Tell us
about your scheme.

We’ll bring the programme, the governance and the certainty. Get in touch to discuss your project.